Products Description:
Products pictures:
Products application:
Q: Can I get free sample?
A: Yes. Free sample can be provided. But if your size is not on our stock list, it may take more or less 7 days for production.
And the freight is on your part, hope you can understand. Thank you.
Q: Do you accept customized order?
A: Yes. Any customized requirement including color, size, package and logo etc. are welcomed.
Q: What's your MOQ?
A: It depends. but small order is also acceptable for the purpose of long time cooperation.
Q: How do you ensure the quality of your products?
Material: PVC film + pressure-sensitive rubber. | |||
Color: Black Red Blue Yellow White Green Brown Grey Violet Orange Yellow/Green | |||
PROPERTY | VAULE | UNIT | TEST METHOD |
Total thickness | 0.13 | mm | ASTM-D-1000 |
Tensile strength | 18 | N/cm | ASTM-D-1000 |
Elongation at break | 180 | % | ASTM-D-1000 |
Voltage resistance | 600 | V | UL510 |
Temperature resistance | -10 -- 80 | °C | ASTM-D-1000 |
Adhesion to steel | 1.5 | N/cm | ASTM-D-1000 |
Adhesion to backing | 1.3 | N/cm | ASTM-D-1000 |
Lead Content | <100 | ppm | US EPA3052 |
Products pictures:
Products application:
Q: Can I get free sample?
A: Yes. Free sample can be provided. But if your size is not on our stock list, it may take more or less 7 days for production.
And the freight is on your part, hope you can understand. Thank you.
Q: Do you accept customized order?
A: Yes. Any customized requirement including color, size, package and logo etc. are welcomed.
Q: What's your MOQ?
A: It depends. but small order is also acceptable for the purpose of long time cooperation.
Q: How do you ensure the quality of your products?
A: At Youcheng Tech. you receive products under guarantee of ISO9001, RoHS.
Q: What are your best lead-times?
A: Immediately shipments are available for stock adhesive tapes. Otherwise we need more or less 25 working days for production.
Q: What are your best lead-times?
A: Immediately shipments are available for stock adhesive tapes. Otherwise we need more or less 25 working days for production.